LiveSTORM · MONITORINGHelp?
Skip to content
Creekward
Excavator loading fill into a white tandem-axle dump truck on a graded commercial pad, a compact track loader and mini excavator on a lowboy trailer, survey stakes in the foreground
Illustrative scene

Line 04 · Contractor Support

Operators, machines, overflow.

Crew support for GCs, developers, utilities and other contractors.

Scope sheet, dates and machine classes — that is enough to price it.

Applications, machines and shots

Each application, the machine classes it calls for, and the paperwork or frame that documents it.

Machine classes this work calls for. Capability, not an ownership claim.

How a job moves

Illustrative scene
  1. Excavator backing toward the rear ramps of an equipment trailer at a commercial site entrance while a spotter signals from well clear
    01

    You send photos

  2. Estimator in a pickup cab reviewing site photos on a tablet, hard hat and hi-vis on the seat, rain on the windshield
    02

    We read the job

  3. Operator's gloved hand on the right joystick of an excavator, forearm on the armrest, red clay splattered on the glass
    03

    The right machine

  4. Freshly graded red-clay building pad ringed by staked silt fence, with a crushed-stone construction entrance from the road
    04

    Finished ground

What moves the price

Support work is priced by the hour, the day or the scope. Nothing here is a price.

  • Access

    Gate width, height limits and whether a lowboy can turn around.

  • Terrain

    Slope, mud, rock and how much pad is already built.

  • Disposal

    Import, haul-off, and where spoils or fill can sit.

  • Utilities

    Locate tickets, potholing and what your site already has marked.

  • Hidden conditions

    Unknown fill, old utilities and unsuitable subgrade under the surface.

  • Scope changes

    Weather days, added bores, redone grades or a moved schedule.

Contractor questions

Do you send operators or full packages?

Both. Operators by the class, or machine and operator together. Paperwork and certificates are handled before the first day.

Do you take small scopes?

Yes. A one-day bore or a half-day of grading is normal work here.

Can you hold a start date?

Dates are set in writing. Storm response in our own markets can pull crews, and we tell you before that happens.

Who carries risk on my site?

It is set in writing before the work starts, based on your contract and your site rules.

How do you handle site orientation?

Send the safety packet with the schedule, and operators arrive ready for your orientation.

Give us the scope.

Plans, dates and machine classes. One short request gets it moving.

CallTextReport damage